Archive for August, 2012

Department of the Army

Sunday, August 26th, 2012

Location: Fort Huachuca, AZ

Click on a picture to enlarge.

U.S. Army Post, Fort Huachuca, Arizona Current Savings on Facilities with GHP’s

  • Electrical KW…..50% Reduction
  • Water Usage…..48% Reduction

Going Green with GHP: The New Armory Facility

Saturday, August 25th, 2012

Location: Tucson, AZ

Click on a picture to enlarge.

LEED Contribution Performance

  • Energy and Atmosphere
    • Uses 80% less electricity
    • Reduces noise pollution
    • 100 tons of GHP = 100 amps 1 Phase
  • Indoor Environmental Quality
  • Water Efficiency
  • Optimize Energy
  • Innovation in Design
    • Greatly improves buildings’ carbon footprint
  • Design & layout included
  • Scheduled maintenance & Quality Control included

Southwest Gas Corporation Building

Friday, August 24th, 2012

Location: Casa Grande, AZ
Click on a picture to enlarge.

Custom Home Application

Thursday, August 16th, 2012

Marcos de Niza High School, Tempe AZ

Thursday, August 16th, 2012

Temco Air Environmental Projects Utilizing the Gas Fired Heat Pumps Distributed from Intellichoice Energy

Wednesday, August 15th, 2012
  1. Fort Huachuca Bldg 22216 (Contracting Office – 2 Story Historical Bldg Retrofit)
  2. Fort Huachuca Bldg 91112 (Drone Training Site and Hanger Facility-Retrofit)
  3. Fort Huachuca Greeley Hall (VTC Commanders Head Quarters-Retrofit)
  4. Davis Monthan AFB (DOD Demonstration Projects Since 2003-PGHP)
  5. The New Armory Building (7 Story Care Facility coupled with Solar- LEED Gold, New Construction)
  6. Marcos De Niza High School (Learning Laboratory – Teacher Lounge)
  7. Southwest Gas Corp. Building, Casa Grande (Utility Building Retrofit Installation)